CPM in Construction Management
James J. O'Brien and Fredric L. Plotnick - McGraw-Hill


Classic First Edition

Second Edition

Third Edition

Seventh Edition - Click HERE to purchase

Fourth Edition

Fifth Edition

Sixth Edition

WHAT'S NEW IN THE SEVENTH EDITION

DOWNLOAD NEWS

UNIVERSITY NEWS

ERRATA

CD has free license for Deltek Open Plan software product
available only with this text - a $2000 value
unlimited license - unlimited activities - unlimited usage

Continued support for P3 Primavera Project Planner
download instructions - screen by screen tutorial

Expanded support for Oracle Primavera latest releases of:
P6 Enterprise Project Portfolio Management
Pertmaster Risk Analysis

Reviews of Other Popular Software Products including:
Microsoft Project 2007 - with tips and tricks for best use
Netpoint and CASCAS-e

Instruction on RDM Relationship Diagramming Method
what it is - who has it - how to use it for better scheduling

Continued in-depth coverage of PDM and ADM systems

Detailed Instruction on Preparation, Review and Response
of Claims for Delay and Claims for Disruption

Review of Other Methodologies for Delay Claims

Latest News to Obtain
Demonstration and Trial
CPM Software

Oracle
Primavera P6 version 8
P6 Professional version 7
P3 Primavera Project Planner version 3.1

SureTrak version 3.0c
Pertmaster (Risk Analysis) version 8.7

Deltek
Open Plan 3.3.1 (2009)

Microsoft
Project Professional 2010

PMA Consultants
Netpoint

CASCAD-e™
CASCAD-e

Phoenix Project Manager
Download Trial

RiskyProject
www.intaver.com

 

Drexel University
Philadelphia PA 19104
Infrastructure Scheduling
Techniques of Project Control

Temple University
Philadelphia PA 19122
CCET 3322

Contact us to list your school

IMPORTANT NOTE ON DELTEK OPEN PLAN CD

 

The CD provided with the book requires a serial number and a password.
The serial number is printed on the CD and readers should take care to key carefully with caps and space as noted.

The password is “UC3I31C4AF
all in caps.
Note both the
letter “I” and number “1”
are included. 

(For readability, the password is “uc3i31c4af” but you must enter in all caps.)

 

IMPORTANT NOTE TO LOG IN TO OPEN PLAN

 

Once you have loaded the
Open Plan software to your computer, you will need a user ID and password to run the software.

 

The defaults are:

User ID = SYSADMIN

Password = PASSWORD

Report other errata here

25aug09: p639 ¶2 line 2:
"PMIOCS" should be "PMICOS"

22apr10: p69, after last line, add missing text:
the start, finish or within the activity. The careful assignment of event numbers makes the network easier to use and avoids unintended logical loops. Random is used here in its literal sense: “without direction, rule, or method.”

03jan11: p103 ¶2 line 3:
"Figure 18.5.4" should be "Figure 20.5.4 at page 338"

03jan11: p115 in box line 2:
"Figure 18.5.1" should be "Figure 20.5.1 at page 334"

03jan11: p645 ¶1 line 1:
"Section 35.14" should be "Section 36.14 at page 622"

04sep11: p69 ¶2 line 8:
“1005j-1051i,should be “1005j-1015i,

01feb12:p88 ¶2 line 3: should be “and the latest of late finishes of all predecessors of that activity”

         
CONSULT AN EXPERT LEGAL DISCLAIMER

CITE in SPECIFICATION

REFERENCE for EXAMS

OTHER TEXTS

Author James J. O'Brien
P.E., PMP

Author Fredric L Plotnick
Ph.D., Esq., P.E.

EnProMaC
Engineering & Property Management Consultants, Inc.

This website is maintained by authors Jim O'Brien and Fred Plotnick.  McGraw-Hill and associated companies are not responsible for, nor have editorial control over this webpage.  Any questions relating to this website should be directed to AUTHORS

 

 
The 7th Edition is cited as a reference document in many Specifications. To assure that your contractors and project personnel are providing a good CPM and not just using CPM software, you should consider citing this 7th edition in your Specification. 

Specifications citing the
7th Edition include:

Be the first be on this list

Provide us with your citation or reference to add your agency to this list

A link to your project site will also be provided if you desire.

Previous Editions have been cited in the Specifications of::

Maricopa County, AZ

Metro Dade Transit Authority

Dallas Area Regional Transit

Provide us with your citation or reference to add your agency to this list

 

CPM in Construction Management 7th Edition
is a perfect reference text to study for certification exams:

AACEi CCE exam

AACEi PSP exam

PMI PMP exam

PMI-SP exam

Provide us with your reference to add your organization and credential exam to this list

A link to your organization and credential exam will also be provided if you desire.

Other texts that may be of interest to readers of
CPM in
Construction Management

Contracts and the Legal Environment for Engineers and Architects, 7th Edition,
Joseph T. Bockrath and Fredric L. Plotnick,
McGraw-Hill, 2010

Construction Change Orders,
James J. O'Brien,
McGraw-Hill, 1998

Construction Inspection Handbook:
Total Quality Management,
James J. O'Brien,
McGraw-Hill, 1997

 

Readers of this text may also enjoy the ENR.com opinion blog The Next Generation
(click here)


Amazon ratings are updated hourly - but on 10/30/09 - at 6 PM - we were rated as #1

 
      You are visitor  number
Hit Counter
to this website
(Click if counter not displayed)